In 1938, the German Army decided to develop an armoured personnel carrier on the basis of the 3-ton half track (HL-KL-9p). Hanomag Hannoversch Machinenbau (AG) in Hannover was ordered to develop the running gear and Bussing-NAG in Berlin was to develop the superstructure to be armoured. Design work was hastened on the model of existing …